What is a final inspection report, and who fills it in?
It is the written record of a final random inspection, also called a pre-shipment inspection: a check of the finished, packed order before it leaves the factory, on a random sample drawn to an agreed AQL. An inspector fills it in on the factory floor. That can be a third-party inspection company, the buyer’s own quality staff or the buying house, but not the factory checking its own work. The report records what was inspected and against which approved sample and tech pack revision, the sampling plan, the quantity and packing checks, every defect counted by class, the measurements and the tests, and ends with a result that the inspector and a factory representative sign. The inspector records what was found; the buyer decides whether the goods ship and whether the balance is paid. Keep it with the photographs and the retained samples, because it is the evidence if a complaint comes after delivery.
How many pieces and how many cartons should a final inspection check?
The pieces come from the sampling plan and the cartons from the carton count. For pieces, most garment orders use ISO 2859-1 (the same tables as ANSI/ASQ Z1.4) at general inspection level II, and the lot size sets the sample: the template’s example lot of 2,880 t-shirts falls in the 1,201 to 3,200 band, code letter K, so 125 pieces are inspected, with up to 7 major defects accepted at AQL 2.5 and up to 10 minor defects at AQL 4.0. Our AQL calculator gives these numbers for any lot. For cartons, a common rule is to open at least the square root of the number of cartons, chosen at random across the whole carton number range: 11 of the example’s 120 cartons. The template works the carton number out for you. Draw the sample pieces from all the opened cartons, so every colour and size is represented, rather than from the first carton opened.
How does the template decide whether the inspection passed?
It answers one question by itself and leaves the verdict to the inspector. The defects table adds up the critical, major and minor defects found in the sample, and the result section compares each total with the accept numbers entered in the sampling plan: if every class is at or under its limit, the cell shows Yes, otherwise No. In the example, 0 critical, 5 major and 7 minor defects against limits of 0, 7 and 10 give Yes. The overall result is still typed by the inspector, as pass, fail or pending, because some findings are not counts: a packing check that failed, a shade question for the buyer, or a test result still to come. That split keeps the arithmetic honest while leaving judgement where it belongs. The accept numbers have to be filled in for the check to work, so copy them from the AQL calculator when you write the plan.
What happens if a final inspection fails?
The lot is not shipped as it is. The usual routes are rework and re-inspection, sorting so that good pieces ship while the rest are repaired, or remaking the goods when the fault is fundamental, such as wrong fabric or a grading error in every size. Record in the report which defects caused the failure, the corrective action, who owns it and the date of the re-inspection, and keep the photographs. Who pays for the re-inspection and how long rework may take before the shipment date is missed belong in the purchase order, agreed before production; our purchase order template has a line for both. Negotiating them over a failed report is slower and costs more. A failure is also information: if the same defect appears in the inline inspection and again at the final, the line was never corrected, and that is the conversation to have with the factory.
Can I use this template for an inline or during-production inspection?
Yes, with a different purpose in mind. The sections work for a during-production inspection, which inspection firms such as QIMA carry out once at least 20% of the order is complete: record the quantity produced so far instead of the quantity packed, use the defects and measurements tables on the pieces made so far, and mark the packing checks N/A if nothing is packed yet. What changes is the result. A final inspection decides whether a lot ships; an inline check exists to find a construction or measurement problem while only a few hundred pieces exist, so its useful output is a corrective action with a date to re-check, not a pass. Since November 2026 there is also a separate inline inspection report template, laid out for that job: progress counts, the sample drawn from the pieces sewn so far, and one row per finding with its action, owner and re-check. Whichever you use, keep the inline report on file: the final inspector should read it before starting.
Is there a garment final inspection report format in Excel?
Yes: this final inspection report template downloads as a free Excel file, with no sign-up, and it also opens in Google Sheets. The file has two sheets, the blank template and the same report filled in for a fictional order of 2,880 t-shirts, and its grey cells do the arithmetic: the share of the order packed, the number of cartons to open (the square root of the carton count, rounded up), the defect totals by class, the measurements out of tolerance and whether the defects are within the accept numbers. The overall result is still typed by the inspector. A printable version is on the same page, and checks made while the order is still being sewn have their own inline inspection report template.
What are the steps of a garment final inspection, from counting cartons to sign-off?
A garment final inspection follows eight steps, in the order this report is laid out: identify the order and lot, fix the sampling plan, check quantity and packing, compare the pieces with the approved sample, count the defects, measure, run the agreed tests and record the result. The sampling plan is written before the visit, from the purchase order. On the day, the inspector counts before judging quality, checking the cartons against the packing list and opening at least the square root of the carton count, chosen across the whole carton number range. Sampled pieces are compared with the sealed sample, each defect is counted as critical, major or minor, every size is measured against the tech pack, and the inspector and a factory representative sign the result.
When should a final random inspection of a clothing order be done?
A final random inspection is done when the whole order has been made and at least 80% of it is packed, so the sample represents what will ship. The 80% threshold is the one inspection firms such as QIMA use, and the template records the order quantity, the quantity finished and the quantity packed, counted from the cartons rather than taken from the factory, then works out the share packed. The common mistake is inspecting while part of the order is still being sewn and recording the result as if it covered the whole order: pieces made after the visit may come from a different line or a different shift. Write the sampling plan before the visit; in the template’s example it is ISO 2859-1 at general inspection level II, with AQL 2.5 for major and 4.0 for minor defects.
How should colour and shade be checked at a garment final inspection?
Shade is judged against the approved lab dip or sealed sample under the light source agreed in the order, not under the factory’s ceiling lights. In the template’s example the agreed light is a D65 light box. The inspector also checks for shade differences between the panels of one garment, comparing every sampled piece with the sealed sample. Checking under the wrong light makes shade the easiest result to argue about later, so name the light source in the purchase order. When a shade question cannot be settled on the spot, the inspector can record the overall result as pending, for the buyer to decide, rather than as a pass or a fail.
What are retained samples on a final inspection report, and why keep them?
Retained samples are a few sealed pieces from the inspected lot, kept by each side as evidence of what passed inspection. In the template’s example, 2 pieces per colour are sealed: 1 goes to the buyer and 1 is kept by the factory. Without them, a complaint after delivery becomes your word against the factory’s, which the template names as the common mistake at sign-off. Keep them with the signed report and the numbered defect photographs. Both the inspector and a factory representative sign the report, but the factory’s signature only confirms that it has seen the findings; it does not mean it accepts a failure. Even when the lot passes, ask for every defective piece found in the sample to be repaired or replaced.