In short
Inline inspection checks garments while they are sewn. Inside the factory, roving checkers check each operator’s work, for example seven pieces at a time; from outside, an inspector visits once at least 20% of the order is made (a during-production inspection, or DUPRO). Both catch faults while most of the order can still be fixed. Neither replaces the final AQL inspection of the finished, packed lot.
Want a costing for your own style? Send us your enquiry
Inline inspection is a quality check made while garments are still being sewn, so that a fault is caught on the first bundles instead of in the finished lot. The term covers two different checks. Inside the factory, roving quality checkers visit each operator on the sewing line and check that operator’s work; in one common method the checker takes seven garments and marks the operator red if even one is faulty. From outside, the buyer, a buying house or an inspection company sends an inspector for a during-production inspection, often called DUPRO, once part of the order is made: QIMA does it when at least 20% of the order is complete and draws its sample by ANSI/ASQ Z1.4. Neither replaces the final AQL inspection, which judges the finished, packed lot. This guide compares the three checks, lists what an inline check covers, and gives a report format you can copy. We read every source on 29 October 2026.
Inline check, during-production inspection, final inspection: what is the difference?
| Check | Who does it | When | How many pieces | What it decides |
|---|---|---|---|---|
| Roving inline check | The factory’s own quality checkers | Throughout sewing, operator by operator | A few pieces of each operator’s work (seven in the “7.0 system”) | Whether an operator carries on, is corrected or is retrained |
| During-production inspection (DUPRO) | The buyer, a buying house or an inspection company | Once, when part of the order is made: at least 20% complete at QIMA, around 20% at HQTS | A random sample; QIMA uses ANSI/ASQ Z1.4 | Whether production follows the specification and the schedule, and what to correct before the rest is sewn |
| Final random inspection | The buyer, a buying house or an inspection company | When the order is finished and mostly packed: at least 80% complete at QIMA | A random sample at the agreed inspection level and AQL | Whether the lot is accepted for shipment |
The words are used loosely. Some suppliers call a during-production visit an inline inspection, and QIMA sells both and adds in-line results to its during-production report when it has run them. Ask any factory or inspector which of the three they mean, and write the checks you want, with their timing, into the order confirmation.

How does a roving inline check work on a sewing line?
A sewing line splits a garment into operations, one or a few per operator. A roving quality checker visits each operator in the line in turn and checks that operator’s own work, so a fault is traced to the person and the machine that made it. Two methods are widely described in the trade:
- The 7.0 system. The checker picks seven garments from the work the operator has done and checks all seven. If one of the seven is faulty, the checker marks red on the operator’s quality performance sheet, may put a red flag on the workstation, and keeps following up until the operator’s work is satisfactory, as Online Clothing Study describes it.
- The traffic light system. Each operator gets a colour after each check: green for very few or no defects, yellow for moderate defects, red for a high defect rate. After a red, production may be stopped for a time, corrective action is immediate and the operator may be retrained or given technical help, according to a 2026 article by Prasanta Sarkar, a textile engineer.
Neither source sets one rule for how often the checker comes round or how many defects make a yellow, and factories set their own. What matters to a buyer is that the checks happen and leave a record. Ask the factory three questions: does a roving checker cover every operation of your style, are the operator sheets kept and can you see them, and what happens on the line after a red.
What does a during-production inspection check?
A during-production inspection is a visit by someone who works for the buyer, not for the line. The inspection companies we read describe much the same scope:
- Production status. Quantities of semi-finished, finished and packed goods counted, and the completion date checked against the schedule (QIMA; HQTS lists production status and timeline verification).
- The product against the specification. Artwork, including spelling, fonts, dimensions, positioning and general design, in QIMA’s list; physical requirements and dimensions, packaging and labelling in HQTS’s. For clothing that means measuring pieces in each size against your chart and tolerances, and checking construction, colour, print or embroidery position, and every label.
- Packing. Export carton dimensions and weights (QIMA), and packaging and labelling (HQTS), so that a carton or barcode problem is found before every carton is packed.
- Product-specific checks and tests, which both companies list: for clothing, for example, a zip or snap pulled, a seam stretched, or a wash test on a printed panel.
QIMA draws its sample following ANSI/ASQ Z1.4, the American counterpart of ISO 2859-1, and its report gives the findings, photos of any defects and an overall pass or fail. Remember what the sample is drawn from: the part of the order that exists on the day. A during-production result tells you how production started, not how the lot will end, which is why the final inspection still follows. Our garment inspection checklist lists the checks for every stage, from the sealed sample to container loading.
Want every order checked like this?
We check quality on the line and run an AQL final inspection before shipment, and you receive the report. Tell us what you want to make.
An inline inspection report format you can copy
An inline report should fit on one or two pages and be written on the day. It has three parts: a header that ties it to one order and one reference, a list of findings with an action for each, and a short measurement sheet. Copy the layout below into a spreadsheet or your own form.
| Field | What to write |
|---|---|
| Order | Purchase order number, style number, colours and order quantity |
| Factory and line | The factory name and address as in the order confirmation, and the line or unit |
| Check and date | Roving check, during-production inspection or re-check; date and time |
| Progress | Pieces cut, sewn, finished and packed at the time of the check |
| Reference | Sealed sample number, tech pack version, measurement chart and tolerances used |
| Sample | Pieces checked per size and colour, and how they were picked |
| Inspector | Name and company, and who received the report |
| No. | Operation or area | What was found | Class | Checked | Faulty | Action agreed | Who | Re-check |
|---|---|---|---|---|---|---|---|---|
| 1 | Neck rib attach | Neck wavy after pressing | Major | 7 | 2 | Machine tension reset, operator shown the sealed sample, bundle re-checked | Line supervisor | Next round |
| 2 | Chest print | Print off position against the tech pack | Major | 20 | 20 | Screen re-registered; printed panels held until checked | Print section | Before the next bundle |
| 3 | Body length, size M | Over tolerance on several pieces | Major | 5 | 3 | Pattern and marker checked against the approved size set | Cutting | Next morning |
| Point of measure | Specification | Tolerance | Piece 1 | Piece 2 | Piece 3 | Piece 4 | Piece 5 | Out of tolerance |
|---|---|---|---|---|---|---|---|---|
| Chest width | From your chart | From your chart | ||||||
| Body length | From your chart | From your chart | ||||||
| Sleeve length | From your chart | From your chart |
End the report with an overall status in one line: carry on, carry on with the actions above, or stop and correct. Add the date of the next check, and the names of the factory’s representative and the inspector. Class each finding with the same defect list you will use at the final inspection, as in our garment defects list, and measure against the tolerances written in your tech pack, as our measurement tolerance guide explains. For the final inspection, our free final inspection report template does the same job in Excel, with the AQL sample and accept and reject numbers.
What should happen when an inline check fails?
- Fix the cause, not only the piece. A wavy neck is a tension, a feed or an operator problem; a measurement drift starts in the pattern, the marker or the cutting. Write the cause next to the finding.
- Go back to the last good check. Every piece sewn since the last good check may carry the same fault. Check those bundles, and repair or reject what fails.
- Re-check on a date. A finding without a re-check date tends to stay open. The next round, or the next morning, should show the fix working.
- Tell the buyer when the specification is affected. A fault in colour, measurements, artwork or labels can change what you receive. You should hear about it from the inline report, not from the final inspection.
- Carry the finding to the final inspection. The final inspector should know what was found inline and check that it was fixed across the lot.
How we run inline checks on our orders
We check quality on the line and run an AQL final inspection on every order, and you receive the report. Our inline checks look at the first bundles and again at around a fifth of production, when a fault can still be put right on most of the order, against the sealed sample and the measurement chart you approved. The inspections agreed for your order, and who receives each report, are written into the order confirmation, and independent inspectors are welcome at any stage. Knitwear and caps are made in our own factory, so you deal directly with the manufacturer; other products are made in an audited partner factory, named to you before production.
Our quality control page sets out every check. Or send us your tech pack: we reply within one working day, and our own orders start at 500 pieces per style and colour.
Questions buyers ask.
What is inline inspection in the garment industry?
Inline inspection is a quality check made while garments are being sewn rather than after they are finished. In the factory it usually means a roving quality checker who visits each operator on the sewing line and checks that operator’s work, for example seven pieces at a time in the 7.0 system, marking the operator red if one is faulty. Buyers also use the term for a during-production inspection by an outside inspector. Either way, the point is to find a construction, measurement or print fault on the first bundles, while most of the order can still be made correctly.
What is the difference between inline inspection and DUPRO?
An inline check is usually the factory’s own, made continuously on the sewing line by roving checkers who look at each operator’s work. A during-production inspection, or DUPRO, is a single visit by someone working for the buyer, such as a buying house or an inspection company, once part of the order is made: QIMA does it when at least 20% is complete. The inline check corrects operators day by day; the DUPRO tells the buyer whether production follows the specification and the schedule. Some suppliers use the two words for the same visit, so ask which one is meant and write it into the order.
When should a during-production inspection be done?
Once enough of the order exists to be representative, but early enough to fix what is found. QIMA carries it out when at least 20% of the order is complete, and HQTS at around 20%. At that point the first sizes and colours are sewn and some cartons may be packed, so measurements, construction, labels and packing can all be checked, and a fault found can still be corrected on roughly four-fifths of the order. On a long order with several colours or a difficult print, a second visit later in production can be worth adding.
Does an inline inspection replace the final AQL inspection?
No. An inline check or a during-production inspection looks at the part of the order that exists on the day, so it shows how production started, not how the finished lot turned out. The final random inspection is made when the order is finished and mostly packed, at least 80% complete at QIMA, on a random sample drawn across cartons, sizes and colours at the agreed AQL, and it decides whether the lot ships. The inline findings should be passed to the final inspector, who checks that each fault was fixed across the lot.
What should an inline inspection report include?
A header that ties it to one order: purchase order and style number, colours, the factory and line, the date, how many pieces were cut, sewn and packed, the sealed sample and tech pack version used, how many pieces were checked, and the inspector’s name. Then each finding with its operation, defect class, pieces checked and faulty, the action agreed, who owns it and a re-check date. Then a short measurement sheet per size, and a one-line status: carry on, carry on with actions, or stop and correct. The report format in this guide sets these out in three tables.
Sources
Checked . Rules and figures change, so confirm anything that affects your pricing.
- QIMA — During production inspection (DUPRO) and in-line inspection: when at least 20% of the order is complete; production status, product specifications and packing; ANSI/ASQ Z1.4-2008 sampling; report with photos and pass or fail (read 29 October 2026) (opens in a new tab)
- QIMA — Pre-shipment inspection (when at least 80% of the order is complete; ANSI/ASQ Z1.4 sampling) (opens in a new tab)
- HQTS — During production check (DUPRO): around 20% of production complete; checks listed; differs from pre-shipment inspection (read 29 October 2026) (opens in a new tab)
- Online Clothing Study — What is the 7.0 system in garment inspection? (seven garments per operator; one faulty piece marks red; 9 July 2020) (opens in a new tab)
- Prasanta Sarkar, Online Clothing Study — What is TLS in the garment industry? (traffic light system: green, yellow and red, and the actions after red; 24 May 2026) (opens in a new tab)
- NIST/SEMATECH e-Handbook of Statistical Methods, section 6.2.3.1: MIL-STD-105D adopted as ANSI Z1.4 and, with minor changes, as ISO 2859-1 (opens in a new tab)